Please login to use this feature. You can use this feature to favourite your items and stores.
Close
You have added this item to your favorite list. View My Favorite List
Close
You have removed this item from your favourite list.
Close
Please login to use this feature. You can use this feature to favourite your items and stores.
Close
You have added this shop to your favourite list. View My Favourite List
Close
You have removed this shop from your favourite list.
Close
DIYTOOLS.SG
DIYTOOLS.SG
DIYTOOLS.SG
(0) 0 out of 5 stars See Shop Review (0)

support@diytools.sg
+65-9100 6666

Region: Singapore, Kallang

Shop Information Newpages Premium Profile
535Visitor 49Orders
366
Active Products

Click the favourite shop button beside of the banner, when discount coupon is created you will see at the member panel > discount coupon page.

MINI WOOD BANDSAW-CUTTING H-5" W-8-1/4" (BLADE 8MM X 0.03 X 56-1/8") 1425MM WBS800

$500.00

Weight: - kg

in stock
  • Product Details
    8-1/4'' Cutting Band Saw Product ID: ST-WBS800 This newly designed model features variable speeds. It permits for variable speed adjustment as desired to suit a wide range of materials. A chip chute is provided at the bottom of the machine frame for connection to a dust collector. The square table tilts 0° ~ -45° for bevel cutting. Optional accessories includes fence, circle cutting attachment and sanding attachment. The circle cutting attachment permits for cutting various diameters of circle. The sanding attachment provides convenient sanding after cut. The customer may choose desired accessories for increasing operation flexibility. In addition to cut wood material, this versatile band saw is also suitable for cutting aluminum and plastic work pieces (Use lower speed when cutting aluminum and plastic work pieces). When requested, a single speed model is avilable.

  • Rating & Reviews of MINI WOOD BANDSAW-CUTTING H-5" W-8-1/4" (BLADE 8MM X 0.03 X 56-1/8") 1425MM WBS800
    0 out of 5 stars
    Average Rating & Reviews (0)

  • Payment Methods

    Paypal

    Pay using your PayPal account. You will be redirected to the PayPal system to complete the payment.

    Online Fund Transfer / Cash or Cheque Deposit / ATM

    Payment Options:
    • Online E-Banking fund transfer
    • Cash/Cheque deposit at bank branches
    • Cash deposit terminal
    • Cheque deposit machine
    • ATM
    Please bank in the purchase amount into the bank account listed below within 3 days:

    RHB BANK
    HUP HONG MACHINERY (S) PTE LTD
    58001497407


    After payment made, you MUST send us the copy of payment slip by
    1. Email to : support@diytools.sg
    2. Go to www.newstore.my/en/my_purchases.html then click the update payment button to update your payment information to us. For guest can go to www.newstore.my/en/order_status.html

    Please stated,
    Order No.:
    Bank:
    Account No.:
    Transaction Date:
    Transaction Amount:

    Note:
    Please allow 2 extra working days for order processing if your payment method is Bank Cheque or Interbank Fund Transfer. The Order will be cancelled without any notice if the payment process not completed within 7 working days.
    Shipping Option
    Shipping Charges
    • Delivery (.00)
      Per Order or Select Self pickup.
      [PROMO] Free Shipping for order above 0

    • Self Pickup (free)
      Pickup Location:
      101 Kitchener Road #01-12/14 Jalan Besar Plaza Singapore 208511.

    Return Policy
  • Product Enquiry
Browse by : Home - All Deals - New Deals - Popular Deals - Shop List - Join NEWSTORE